4.3 Checkpoint: Prototype Demo & Validation Summary
The Integration Checkpoint connects the Skill Track and the Venture Track. You show what you learned in Module 4 with evidence, not opinion.
Checkpoint assignment
- Prototype demo plus customer validation summary
- Present prototype and testing results
- Document iteration decisions
Evidence portfolio requirements
Add each of these to your evidence portfolio before moving on:
- Solution Concept Portfolio (5–10 Ideas)
- MVP Definition Document
- Low-Fidelity Prototype (Photos/Screenshots/Description)
- Prototype Testing Feedback (3–5 Customers)
- Solution Selection Rationale
- Iteration Summary
How this checkpoint is assessed
Your instructor chooses one of three paths, so every student can succeed whether or not their venture moves forward:
- Option A (default): 40% Skill Track, 40% Venture Track, 20% Integration
- Option B: 100% Skill Track, for students whose ventures don't progress
- Option C: 100% Venture Track, for experienced students
Looking ahead
Module 5 builds directly on this evidence, so keep your portfolio up to date.