Skip to main content

2.3 Checkpoint: Problem Validation Evidence Package

The Integration Checkpoint connects the Skill Track and the Venture Track. You show what you learned in Module 2 with evidence, not opinion.

Checkpoint assignment

  • Problem Validation Evidence Package (5–7 pages)
  • Includes problem statement, interview evidence, patterns, and opportunity assessment

Evidence portfolio requirements

Add each of these to your evidence portfolio before moving on:

  • Interview Guide
  • Interview Practice Reflection
  • 5 Complete Interview Summaries
  • Interview Insights Synthesis
  • Evidence-Based Problem Statement
  • Early Adopter Profile (Preliminary)
  • Problem Validation Evidence Package

How this checkpoint is assessed

Your instructor chooses one of three paths, so every student can succeed whether or not their venture moves forward:

  • Option A (default): 40% Skill Track, 40% Venture Track, 20% Integration
  • Option B: 100% Skill Track, for students whose ventures don't progress
  • Option C: 100% Venture Track, for experienced students

Looking ahead

Module 3 builds directly on this evidence, so keep your portfolio up to date.